33、choose four
Which four statements are true about the components of the Oracle Scheduler?
A) A program and schedule can be specified as part of a job definition.
B) A job may get started automatically when a window opens.
C) A scheduler job can point to a chain instead of pointing to a single program object.
D) A program and job can be specified as part of a schedule definition.
E) A job is specified as part of a program specification.
F) A schedule can be specified to a single job only.
G) A program can be used in the definition of multiple jobs.
Answer:ABCG
(解析:job包含schedule和program,到了时间,job能够自动运行,job可以是指向一个program 也可以指向一个job的链接。来自3组:1015267481)
原文地址:https://blog.51cto.com/13854012/2398396
时间: 2024-09-30 11:13:54